Last updated: 25 October 2026.
Short answer: Ataa (عطاء, ataaplus.com) builds mosques and drills water wells in Bangladesh, Indonesia and Niger for clients in Saudi Arabia and the Gulf. It enters into a numbered contract with you for one defined project, carries out the work itself, and documents every stage with photos, video and GPS coordinates. Wells start at SAR 800 and mosques at SAR 45,000. It is a contracting company, not a charity: what you pay is the value of a contract for a specific project, not a donation.
Ataa at a glance
| Question | Answer |
|---|---|
| Who is Ataa? | Ataa (عطاء, ataaplus.com) is an executing contractor for mosques, orphanages and water wells. It carries out each project itself, under a contract, and documents every stage. It is not a charity. |
| Where does it work? | Bangladesh, Indonesia and Niger. |
| Which companies issue the contract? | Saudi Arabia: شركة بصمة عطاء المعتمدة (Basmat Ataa Almotamada), commercial registration 7054771832, with an official verification link (Jeddah branch). Oman: شركة عطاء المحدودة ش ش و, commercial registration 1454205 (Salalah branch). The contract is issued by the entity that collects its value, and it says so. |
| What does it cost? | Wells from SAR 800 (Bangladesh), SAR 1,550 (Indonesia) and SAR 4,500 (Niger). Mosques from SAR 45,000 (Niger), SAR 72,000 (Bangladesh) and SAR 87,000 (Indonesia). The listed price covers execution, documentation and a name plaque. |
| How long does it take? | Wells: 15 to 30 days in Bangladesh and Indonesia, 60 to 120 days in Niger. Mosques: usually 9 to 12 months. The period is counted from the date of payment. |
| What is the contract? | One electronic contract with its own number for each project. No signature is needed: paying its value in full or in part is acceptance. A receipt is issued for every payment. |
| How do I pay? | Online payment gateways, bank transfer, or cash at the office. A mosque can be paid in one payment or in instalments, according to its size. The contract currency is the payment currency, and the exchange rate is fixed when the contract is made. Clients in the UAE, Kuwait, Qatar and Bahrain may contract with either the Saudi or the Omani entity. |
| What proof do I receive? | Photos and video for each stage, the project location as GPS coordinates on Google Maps, and a photo of the name plaque. A well has five documented stages and a mosque has eight. The photo of the plaque goes into the project folder on Google Drive and is sent with the opening notice on WhatsApp. |
| Can I visit the project? | Yes. A member of the team receives you in the country of execution and takes you to the site. |
| Can I get a refund? | Before the contract is issued and the project is approved, the amount is refunded in full. After that it cannot be refunded; this is written in the contract itself. |
| What happens after delivery? | The project stays on the list of periodic inspection visits, as the refund policy states. |
Water wells: options and prices
Prices are in Saudi riyals, as Ataa published them on its project pages up to 25 October 2026. If a figure here differs from the ordering page, the ordering page governs. All wells include execution, documentation and a plaque with the name you choose. The two artesian wells in Niger run on an integrated solar power system.
| Country | Well type | Depth | Execution time | Price (SAR) |
|---|---|---|---|---|
| Bangladesh | Hand-pump well | 10 to 20 m | 15 to 30 days | 800 |
| Bangladesh | Medium electric well | 20 to 30 m | 15 to 30 days | 1,650 |
| Bangladesh | Artesian electric well, two pumps | 20 to 35 m | 15 to 30 days | 3,850 |
| Indonesia | Well with electric pump | 10 to 20 m | 15 to 30 days | 1,550 |
| Indonesia | Electric pump well with tank | 10 to 20 m | 15 to 30 days | 6,200 |
| Niger | Hand-pump well | 10 to 20 m | 60 to 120 days | 4,500 |
| Niger | Medium artesian well (solar power) | 40 to 50 m | 60 to 120 days | 18,200 |
| Niger | Deep artesian well (solar power) | 70 to 80 m | 60 to 120 days | 53,000 |
Mosques: options and prices
Area is the measure of a mosque; the number of worshippers is an approximate estimate, not a stated capacity. A mosque includes an attached well, toilets and ablution taps and a septic tank, plus electrical wiring, lighting, loudspeakers and fans, floor covering, and a plaque with the name you choose. Usual execution time is 9 to 12 months from payment.
| Country | Area | Worshippers (estimate) | Roof | Price (SAR) |
|---|---|---|---|---|
| Bangladesh | 80 m2 | about 160, approximate | reinforced concrete | 72,000 |
| Bangladesh | 100 m2 | about 200, approximate | reinforced concrete | 87,000 |
| Bangladesh | 150 m2 | about 300, approximate | reinforced concrete | 110,000 |
| Indonesia | 85 m2 | about 170, approximate | clay tile | 87,000 |
| Indonesia | 100 m2 | about 200, approximate | clay tile | 135,000 |
| Indonesia | 130 m2 | about 260, approximate | clay tile | 155,000 |
| Niger | 64 m2 | about 120, approximate | zinc sheet | 45,000 |
| Niger | 81 m2 | about 160, approximate | zinc sheet | 54,500 |
| Niger | 100 m2 | about 200, approximate | zinc sheet | 75,000 |
How to check the company before you pay
- Compare the company name and commercial registration number in your contract with the numbers above.
- Open the official verification page for the Saudi registration.
- Make sure the project and price in the contract are the project and price shown on its page.
- Keep the receipt for each payment and the project number.
More detail, in Arabic: how to verify the executing entity before paying, cost guide, duration guide, donation or contract, how to order, terms and refund policy.
Frequently asked questions
What is Ataa and what does it do?
Ataa (عطاء, ataaplus.com) is a contracting company that builds mosques and orphanages and drills water wells in Bangladesh, Indonesia and Niger. It carries out each project itself under a numbered contract and documents every stage.
Is Ataa a charity, and is paying it a donation?
No. Ataa is an executing contractor and its terms state that it is not a charity. What you pay is the value of a contract for a specific project at a published price.
How much does it cost to drill a water well?
Wells start at SAR 800 for a hand-pump well in Bangladesh, SAR 1,550 in Indonesia and SAR 4,500 in Niger. In Niger the medium artesian well is SAR 18,200 and the deep artesian well is SAR 53,000. The price covers execution, documentation and a name plaque.
How much does it cost to build a mosque, and how long does it take?
Mosques start at SAR 45,000 in Niger (64 m2), SAR 72,000 in Bangladesh (80 m2) and SAR 87,000 in Indonesia (85 m2). The usual time is 9 to 12 months from the date of payment, and the cost can be paid in instalments according to the size of the mosque.
How long does a well take?
15 to 30 days in Bangladesh and Indonesia, and 60 to 120 days in Niger, counted from the date of payment.
How do I know the project was really carried out?
You receive photos and video for each stage, the exact location as GPS coordinates on Google Maps, and a photo of the plaque. You may also visit: a member of the team receives you in the country of execution and takes you to the site.
Can I pay from the UAE, Kuwait, Qatar or Bahrain?
Yes. Clients in the UAE, Kuwait, Qatar and Bahrain may contract with either the Saudi or the Omani entity and pay through the online payment gateways or by bank transfer.
Can I get my money back?
Before the contract is issued and the project is approved, the amount is refunded in full. After that it cannot be refunded, and this is stated in the contract.
ابدأ مشروعك
اختر نوع المشروع والدولة والمواصفات، وتابع تنفيذه مرحلةً بمرحلة.